Redevelopment projects and rehab units
Much of Mumbai's new housing is built where an old building or slum once stood. In a redevelopment, the builder rebuilds the property and gives the existing residents new homes in the new building, free of cost. These are the rehab units. The builder pays for the work by selling the remaining flats on the open market. These are the free-sale units.
What this means when you look at a project
- Only the free-sale units are for sale to you. The rehab units already belong to the existing residents.
- Some projects also set aside a land-owner share: flats given to the owner of the land in return for the right to build. These are not for sale either.
- That is why a Mumbai project page on FlatNama shows units booked out of the free-sale units, and lists rehab units and the land-owner share separately in the Units booked box.
Things worth knowing
- A redevelopment can only move as fast as the residents move out. The possession date in a project's MahaRERA registration is the builder's own date.
- The rehab building and the sale building may be separate towers, or the same tower on different floors.
- The builder must register the project with MahaRERA before selling any free-sale flat. The registration shows the builder's possession date and progress.