Pixel, Ghatkopar East

by Dharmi Properties Pvt Ltd · Ghatkopar East, Mumbai 400077 · Map

Launched
Dec 20226 yrs promised
Possession (MahaRERA)
Dec 2028Not extended
Concrete structure
100%Nearing possession
Booked
0 of 10%
Buildings
10.4 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

3 BHK
1
Total units
1
Buildings
1
Land
0.4 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services30%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Oct 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 30%Dec 2025: Final finishes 30%Jul 2026: Final finishes 30%Oct 2026: Final finishes 30%Excavation 100%Concrete structure (RCC) 100%Final finishes 30%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%30%0
100%100%30%0
100%100%30%0
100%100%30%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400077

Projects with up to 10 flats, launched within 1 year of this one.

Compared with 3 similar projects in PIN 400077
MeasureThis projectSimilar projects
Launch to possession (as first promised)6 yrs2 yrs 3 mths
Possession date extendedNo3 of 3
Possession date (MahaRERA)Dec 2028Mar 2025
Concrete structure (RCC)100%100%
Units booked0%60%
MahaRERA complaints (filed by or against the builder)00

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Pixel by Dharmi Properties Pvt Ltd is a 1-unit BMC-sanctioned project in Ghatkopar East, Mumbai 400077, launched in December 2022 with possession due in December 2028. 0 units booked out of total 1 unit. The concrete structure (RCC) is complete.

Read full summary

Pixel is a BMC-sanctioned project by Dharmi Properties Pvt Ltd in Ghatkopar East, Mumbai 400077, registered with MahaRERA as P51800048077. It was launched in December 2022. It has 1 unit in 1 building, with 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2028, unchanged since launch. Construction: excavation complete, structure (RCC) complete, final finishes 30% complete.

0 units booked out of total 1 unit (0%).