Aarambh Phase III by group Satellite, Malad East

by Satellite Developers Private Limited · Malad East, Mumbai 400097 · Map

Launched
Apr 20234 yrs 4 mths promised
Possession (MahaRERA)
Aug 2027Not extended
Concrete structure
0%Early stage
Booked
135 of 45630%
Buildings
10.2 acres
MahaRERA complaints
2Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
456
Total units
456
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
2

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation20%
Concrete structure (slabs)0%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 20%Dec 2025: Excavation 20%Jul 2026: Excavation 20%Oct 2026: Excavation 20%Dec 2024: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 0%Jul 2026: Concrete structure (RCC) 0%Oct 2026: Concrete structure (RCC) 0%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 20%Concrete structure (RCC) 0%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
20%0%0%135
20%0%0%–
20%0%0%–
20%0%0%89

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Aarambh Phase III by group Satellite by Satellite Developers Private Limited is a 456-unit SRA-sanctioned project in Malad East, Mumbai 400097, launched in April 2023 with possession due in August 2027. 135 units booked out of total 456 units. Work on the concrete structure (RCC) has not started.

Read full summary

Aarambh Phase III by group Satellite is an SRA-sanctioned project by Satellite Developers Private Limited in Malad East, Mumbai 400097, registered with MahaRERA as P51800050326. It was launched in April 2023. It has 456 units in 1 building, with 1 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is August 2027, unchanged since launch. Construction: excavation 20% complete, structure (RCC) not started, final finishes not started.

135 units booked out of total 456 units (30%).