Proposed Residential cum Commercial Redevelopment of Apna Ghar Unit No. 9 CHSL, Andheri West

by Bharat Realty Venture Private Limited · Andheri West, Mumbai 400053 · Map

Launched
Sep 20237 yrs promised
Possession (MahaRERA)
Sep 2030Not extended
Concrete structure
100%Nearing possession
Booked (free sale)
134 of 16382% · 120 rehab units
Buildings
11.6 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale134 booked out of 163 units

Rehab120 units for existing members

Total 283 units. Rehab units are not for sale.

Project facts

3 BHK
257
Other units
26
Total units
283
Buildings
1
Land
1.6 acres
Phases
1
MahaRERA complaints
0
Free-sale units
163
Rehab units
120

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services10%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 20%Dec 2025: Concrete structure (RCC) 53%Jul 2026: Concrete structure (RCC) 65%Oct 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 10%Dec 2025: Final finishes 10%Jul 2026: Final finishes 10%Oct 2026: Final finishes 10%Excavation 100%Concrete structure (RCC) 100%Final finishes 10%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%10%134
100%65%10%134
100%53%10%119
100%20%10%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Proposed Residential cum Commercial Redevelopment of Apna Ghar Unit No. 9 CHSL by Bharat Realty Venture Private Limited is a 283-unit SRA-sanctioned project in Andheri West, Mumbai 400053, launched in September 2023 with possession due in September 2030. 134 units booked out of 163 units for sale. The concrete structure (RCC) is complete.

Read full summary

Proposed Residential cum Commercial Redevelopment of Apna Ghar Unit No. 9 CHSL is an SRA-sanctioned project by Bharat Realty Venture Private Limited in Andheri West, Mumbai 400053, registered with MahaRERA as P51800052790. It was launched in September 2023. It has 283 units in 1 building: 257 homes (3 BHK) and 26 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active. Of the 283 units, 163 are for sale and 120 are rehab units for existing members.

Its registered possession date is September 2030, unchanged since launch. Construction: excavation complete, structure (RCC) complete, final finishes 10% complete.

134 units booked out of 163 units for sale (82%). Since the July 2026 update, the reported concrete structure (RCC) has gone from 65% to 100%.