West Avenue, Andheri West

by Amar Lifespaces LLP · Andheri West, Mumbai 400058 · Map

Launched
Nov 20242 yrs 1 mth promised
Possession (MahaRERA)
Dec 2026Not extended
Concrete structure
90%Mid-construction
Booked
–
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

Other units
21
Total units
21
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)90%
Finishes, lifts and services10%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 90%Dec 2025: Concrete structure (RCC) 90%Jul 2026: Concrete structure (RCC) 90%Oct 2026: Concrete structure (RCC) 90%Dec 2024: Final finishes 10%Dec 2025: Final finishes 10%Jul 2026: Final finishes 10%Oct 2026: Final finishes 10%Excavation 100%Concrete structure (RCC) 90%Final finishes 10%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%90%10%–
100%90%10%–
100%90%10%–
100%90%10%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

West Avenue by Amar Lifespaces LLP is a 21-unit BMC-sanctioned project in Andheri West, Mumbai 400058, launched in November 2024 with possession due in December 2026. The concrete structure (RCC) is 90% complete.

Read full summary

West Avenue is a BMC-sanctioned project by Amar Lifespaces LLP in Andheri West, Mumbai 400058, registered with MahaRERA as P51800077899. It was launched in November 2024. It has 21 units in 1 building, as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, unchanged since launch. Construction: excavation complete, structure (RCC) 90% complete, final finishes 10% complete.