K Ras Residency, Parel

by K Ras Group · Parel, Mumbai 400012 · Map

Launched
Aug 20179 yrs 1 mth promised
Possession (MahaRERA)
Sep 2026Not extended
Concrete structure
23%Mid-construction
Booked
3 of 3100%
Buildings
10.2 acres
MahaRERA complaints
8Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

Other units
3
Total units
3
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
8

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)23%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 23%Dec 2025: Concrete structure (RCC) 23%Jul 2026: Concrete structure (RCC) 23%Oct 2026: Concrete structure (RCC) 23%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 23%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%23%0%3
100%23%0%–
100%23%0%–
100%23%0%3

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

K Ras Residency by K Ras Group is a 3-unit BMC-sanctioned project in Parel, Mumbai 400012, launched in August 2017 with possession due in September 2026. 3 units booked out of total 3 units. The concrete structure (RCC) is 23% complete.

Read full summary

K Ras Residency is a BMC-sanctioned project by K Ras Group in Parel, Mumbai 400012, registered with MahaRERA as P51900011299. It was launched in August 2017. It has 3 units in 1 building, as registered with MahaRERA. Its MahaRERA status is Active.

Possession was due in September 2026. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 23% complete, final finishes not started.

3 units booked out of total 3 units (100%).