Ocean Drive, Kalbadevi

by Atul Projects Gk Private Limited · Kalbadevi, Mumbai 400002 · Map

Launched
Jun 20197 yrs 9 mths promised
Possession (MahaRERA)
Mar 2027Not extended
Concrete structure
13%Mid-construction
Booked
3 of 1520%
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
12
3 BHK
2
4 BHK
1
Total units
15
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)13%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 13%Jul 2026: Concrete structure (RCC) 13%Oct 2026: Concrete structure (RCC) 13%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 13%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%13%0%3
100%13%0%3
100%13%0%3
100%0%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Ocean Drive by Atul Projects Gk Private Limited is a 15-unit BMC-sanctioned project in Kalbadevi, Mumbai 400002, launched in June 2019 with possession due in March 2027. 3 units booked out of total 15 units. The concrete structure (RCC) is 13% complete.

Read full summary

Ocean Drive is a BMC-sanctioned project by Atul Projects Gk Private Limited in Kalbadevi, Mumbai 400002, registered with MahaRERA as P51900021226. It was launched in June 2019. It has 15 units in 1 building, with 2, 3 and 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is March 2027, unchanged since launch. Construction: excavation complete, structure (RCC) 13% complete, final finishes not started.

3 units booked out of total 15 units (20%).