Shanti Kunj- A Project by Tridhaatu, Wadala West
by Tridhaatu Renovators Private Limited · Wadala West, Mumbai 400031 · Map
- Launched
- Sep 20204 yrs 9 mths originally promised
- Possession (MahaRERA)
- Dec 2028Extended by 3 yrs 6 mths
- Concrete structure
- 60%Mid-construction
- Booked
- 5 of 5100%
- Buildings
- 10.1 acres
- MahaRERA complaints
- 1Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 3 BHK
- 2
- 4 BHK
- 3
- Total units
- 5
- Buildings
- 1
- Land
- 0.1 acres
- Phases
- 1
- MahaRERA complaints
- 1
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 60% | 0% | 5 | |
| 100% | 60% | 0% | 5 | |
| 100% | 60% | 0% | 5 | |
| 0% | 0% | 0% | 0 |
"–" means MahaRERA shows no figure for that update.
About this project
Shanti Kunj- A Project by Tridhaatu by Tridhaatu Renovators Private Limited is a 5-unit BMC-sanctioned project in Wadala West, Mumbai 400031, launched in September 2020 with possession due in December 2028. 5 units booked out of total 5 units. The concrete structure (RCC) is 60% complete.
Read full summary
Shanti Kunj- A Project by Tridhaatu is a BMC-sanctioned project by Tridhaatu Renovators Private Limited in Wadala West, Mumbai 400031, registered with MahaRERA as P51900026505. It was launched in September 2020. It has 5 units in 1 building, with 3 and 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2028, extended by 3 years 6 months from the original June 2025. Construction: excavation complete, structure (RCC) 60% complete, final finishes not started.
5 units booked out of total 5 units (100%).
Tridhaatu's track record in Mumbai
MahaRERA projects registered 2017–2023 in Mumbai
| Projects registered with MahaRERA | 12 |
|---|---|
| Total units across these projects | 649 |
| Completed without extending the possession date | 1 |
| Completed after an extension | 1 |
| Lapsed | 6 |
| Under construction | 4 |
| Possession date extended on the builder's application | 6 |
| Typical time from launch to 100% structure | 7 years 4 months |
| MahaRERA complaints (filed by or against the builder), all Tridhaatu projects | 33 (10 of 12 projects) |
- Completed without extending the possession date: MahaRERA shows the project Completed and the builder did not apply to extend its possession date. MahaRERA's blanket extensions (COVID 2020–21, and the automatic 4 months of August 2026) are not counted as the builder's.
- Completed after an extension: MahaRERA shows the project Completed after the builder extended its possession date.
- Lapsed: the possession date passed with no extension or completion filed on MahaRERA; it does not by itself mean work has stopped.
- Under construction: MahaRERA status Active.
- Possession date extended on the builder's application: counted across all of the above, so it overlaps them.
- Typical time from launch to 100% structure: the middle value for projects whose concrete structure (RCC) reached 100% between December 2023 and October 2026, counted from registration.
- MahaRERA complaints: complaints on MahaRERA filed by or against the builder, on all its projects.