Composite Building Rehab Wing A1, Andheri West

by A R Amboli Developers Private Limited · Andheri West, Mumbai 400058 · Map

Launched
Apr 20262 yrs 8 mths promised
Possession (MahaRERA)
Dec 2028Not extended
Concrete structure
0%Early stage
Booked
62 of 8771%
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
87
Total units
87
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0
Reserved units
62

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)0%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Jul 2026Oct 2026Jul 2026: Excavation 100%Oct 2026: Excavation 100%Jul 2026: Concrete structure (RCC) 0%Oct 2026: Concrete structure (RCC) 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 0%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%0%0%62
100%0%0%62

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400058

Projects with 40–200 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400058
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 8 mths3 yrs
Possession date extendedNo2 of 6
Possession date (MahaRERA)Dec 2028Sep 2029
Concrete structure (RCC)0%0%
Units booked71%17%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Composite Building Rehab Wing A1 by A R Amboli Developers Private Limited is an 87-unit SRA-sanctioned project in Andheri West, Mumbai 400058, launched in April 2026 with possession due in December 2028. 62 units booked out of total 87 units. Work on the concrete structure (RCC) has not started.

Read full summary

Composite Building Rehab Wing A1 is an SRA-sanctioned project by A R Amboli Developers Private Limited in Andheri West, Mumbai 400058, registered with MahaRERA as PR1180002600194. It was launched in April 2026. It has 87 units in 1 building, with 1 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2028, unchanged since launch. Construction: excavation complete, structure (RCC) not started, final finishes not started.

62 units booked out of total 87 units (71%).