Skip to main content
← Back

Sharada Myria B and C Building, Kirkatwadi

Ready to move

by Sharada Erectors Private Limited. Kirkatwadi, Pune 411024. View on Google Maps

Completed (MahaRERA)
As reported in December 2025Launched December 2018

Project facts

1 RK4
1 BHK89
2 BHK30
3 BHK17
Other units (shops, offices or not given by type)34
Total units174
Buildings2
Land3.8 acres
Complaints on MahaRERA (filed by or against the builder)0
Share on WhatsApp

Other phases of this project

About this project

Sharada Myria B and C Building (MahaRERA P52100018973) is a residential project by Sharada Erectors Private Limited in Kirkatwadi, Pune 411024. It was launched in December 2018 and has 174 units in 2 buildings: 140 homes (1 RK, 1 BHK, 2 BHK & 3 BHK) and 34 other units (shops, offices or not given by type). MahaRERA shows it as Completed, as reported in December 2025.

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100018973.Check it on MahaRERA (P52100018973)All projects in Khadakwasla, Kirkatwadi