Neumec Vinayak, Vile Parle East

Lapsed

by Neumec Venture · Vile Parle East, Mumbai 400057 · Map

Launched
Jul 20171 yr 8 mths originally promised
Possession (MahaRERA)
Sep 2020Extended by 1 yr 6 mthsWhat does Lapsed mean?
Concrete structure
50%Mid-construction
Booked
6 of 2129%
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
20
2 BHK
1
Total units
21
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation95%
Concrete structure (slabs)50%
Finishes, lifts and services10%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 95%Dec 2025: Excavation 95%Jul 2026: Excavation 95%Oct 2026: Excavation 95%Dec 2024: Concrete structure (RCC) 50%Dec 2025: Concrete structure (RCC) 50%Jul 2026: Concrete structure (RCC) 50%Oct 2026: Concrete structure (RCC) 50%Dec 2024: Final finishes 10%Dec 2025: Final finishes 10%Jul 2026: Final finishes 10%Oct 2026: Final finishes 10%Excavation 95%Concrete structure (RCC) 50%Final finishes 10%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
95%50%10%6
95%50%10%–
95%50%10%–
95%50%10%6

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400057

Projects with 10–50 flats, launched within 6 months of this one.

Compared with 3 similar projects in PIN 400057
MeasureThis projectSimilar projects
Launch to possession (as first promised)1 yr 8 mths1 yr 7 mths
Possession date extendedBy 1 yr 6 mths3 of 3
Possession date (MahaRERA)Sep 2020Jun 2022
Concrete structure (RCC)50%0%
Units booked29%84%
MahaRERA complaints (filed by or against the builder)00

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Neumec Vinayak by Neumec Venture is a 21-unit project in Vile Parle East, Mumbai 400057, launched in July 2017; its MahaRERA registration has lapsed. 6 units booked out of total 21 units. The concrete structure (RCC) is 50% complete.

Read full summary

Neumec Vinayak is a project by Neumec Venture in Vile Parle East, Mumbai 400057, registered with MahaRERA as P51800001651. It was launched in July 2017. It has 21 units in 1 building, with 1 and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in September 2020, after an extension of 1 year 6 months from the original March 2019. That date has passed and no further extension has been recorded. Construction: excavation 95% complete, structure (RCC) 50% complete, final finishes 10% complete.

6 units booked out of total 21 units (29%).