- Launched
- Aug 2017First of 2 phases
- Possession (MahaRERA)
- Jul 2018 – Jul 2023Not extendedWhat does Lapsed mean?
- Concrete structure
- 62%Weighted across 2 phases
- Booked
- 54 of 7869%
- Buildings
- 20.5 acres
- MahaRERA complaints
- 6Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 4 BHK
- 78
- Total units
- 78
- Buildings
- 2
- Land
- 0.5 acres
- Phases
- 2
- MahaRERA complaints
- 6
The 2 phases
| Phase | MahaRERA no. | Flats | Possession | Structure | Booked |
|---|---|---|---|---|---|
| Krishaang A Wing Mid-construction Lapsed | P51800005295 | 39 | 24% | 69% | |
| Krishaang B Wing Ready to move Lapsed | P51800012276 | 39 | 100% | 69% |
Show updates by phase
Krishaang A Wing (P51800005295)
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 24% | 0% | 27 | |
| 100% | 24% | 0% | – | |
| 100% | 24% | 0% | – | |
| 100% | 24% | 0% | 27 |
"–" means MahaRERA shows no figure for that update.
Krishaang B Wing (P51800012276)
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 95% | 27 | |
| 100% | 100% | 95% | – | |
| 100% | 100% | 95% | – | |
| 100% | 100% | 95% | 27 |
"–" means MahaRERA shows no figure for that update.
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
About this project
Krishaang by Jaycee Homes Private Limited is a 78-unit project in Powai, Mumbai 400076, registered with MahaRERA in 2 phases, with possession dates from July 2018 to July 2023. 54 units booked out of total 78 units. The concrete structure (RCC) is 62% complete.
Read full summary
Krishaang is a project by Jaycee Homes Private Limited in Powai, Mumbai 400076, registered with MahaRERA as 2 phases (P51800005295, P51800012276). The first phase was launched in August 2017. Together the phases have 78 units in 2 buildings, with 4 BHK homes as registered with MahaRERA. Both phases are lapsed on MahaRERA.
The phases' registered possession dates run from July 2018 to July 2023; no phase has an extended possession date. Across all phases, weighted by flats, the concrete structure (RCC) is 62% complete and final finishes 48% complete. Neither phase has its structure complete.
54 units booked out of total 78 units (69%).