Aarc Residency, Andheri West

Lapsed

by Aarc Housing Co · Andheri West, Mumbai 400053 · Map

Launched
Aug 20173 yrs 7 mths promised
Possession (MahaRERA)
Mar 2021Not extendedWhat does Lapsed mean?
Concrete structure
70%Mid-construction
Booked
–
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

Other units
28
Total units
28
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)70%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 70%Dec 2025: Concrete structure (RCC) 70%Jul 2026: Concrete structure (RCC) 70%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 70%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%70%0%–
100%70%0%–
100%70%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Aarc Residency by Aarc Housing Co is a 28-unit project in Andheri West, Mumbai 400053, launched in August 2017; its MahaRERA registration has lapsed. The concrete structure (RCC) is 70% complete.

Read full summary

Aarc Residency is a project by Aarc Housing Co in Andheri West, Mumbai 400053, registered with MahaRERA as P51800006940. It was launched in August 2017. It has 28 units in 1 building, as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in March 2021. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 70% complete, final finishes not started.