Ekta Residency, Chembur

Lapsed

by Ashok Hazarimal Tharwani · Chembur, Mumbai 400089 · Map

Launched
Sep 20172 yrs 3 mths promised
Possession (MahaRERA)
Dec 2019Not extendedWhat does Lapsed mean?
Concrete structure
98%Mid-construction
Booked
–
Buildings
20.5 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

Other units
117
Total units
117
Buildings
2
Land
0.5 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)98%
Finishes, lifts and services93%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 98%Dec 2025: Concrete structure (RCC) 98%Jul 2026: Concrete structure (RCC) 98%Dec 2024: Final finishes 93%Dec 2025: Final finishes 93%Jul 2026: Final finishes 93%Excavation 100%Concrete structure (RCC) 98%Final finishes 93%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%98%93%–
100%98%93%–
100%98%93%114

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Ekta Residency by Ashok Hazarimal Tharwani is a 117-unit project in Chembur, Mumbai 400089, launched in September 2017; its MahaRERA registration has lapsed. The concrete structure (RCC) is 98% complete.

Read full summary

Ekta Residency is a project by Ashok Hazarimal Tharwani in Chembur, Mumbai 400089, registered with MahaRERA as P51800012424. It was launched in September 2017. It has 117 units in 2 buildings, as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2019. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 98% complete, final finishes 93% complete.