by Sheth Creators and Sunvision Private Limited · Malad West, Mumbai 400064 · Map

Launched
Mar 2018First of 2 phases
Possession (MahaRERA)
Dec 2025 – Oct 2028Not extended
Concrete structure
65%Weighted across 2 phases
Booked
507 of 64379%
Buildings
20.1 acres
MahaRERA complaints
6Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
287
2 BHK
356
Total units
643
Buildings
2
Land
0.1 acres
Phases
2
MahaRERA complaints
6

The 2 phases

PhaseMahaRERA no.FlatsPossessionStructureBooked
Irene Wing A Phase 1
Nearing possession Lapsed
P51800015507257100%98%
Irene Wing B Phase 1
Mid-construction
P5180004720938642%66%
Show updates by phase

Irene Wing A Phase 1 (P51800015507)

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%22%253
100%100%22%–
100%100%22%–
100%100%22%253

"–" means MahaRERA shows no figure for that update.

Irene Wing B Phase 1 (P51800047209)

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%42%0%254
100%22%0%251
100%0%0%252
80%0%0%0

"–" means MahaRERA shows no figure for that update.

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)65%
Finishes, lifts and services9%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 88%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 40%Dec 2025: Concrete structure (RCC) 40%Jul 2026: Concrete structure (RCC) 53%Oct 2026: Concrete structure (RCC) 65%Dec 2024: Final finishes 9%Dec 2025: Final finishes 9%Jul 2026: Final finishes 9%Oct 2026: Final finishes 9%Excavation 100%Concrete structure (RCC) 65%Final finishes 9%

How to read construction stages

Compared with 3 similar projects in PIN 400064

Projects with 300–1,300 flats, launched within 1 year of this one.

Compared with 3 similar projects in PIN 400064
MeasureThis projectSimilar projects
Launch to possession (as first promised)6 yrs 10 mths6 yrs 3 mths
Possession date extendedNo2 of 3
Possession date (MahaRERA)Dec 2025 – Oct 2028Dec 2024
Concrete structure (RCC)65%80%
MahaRERA complaints (filed by or against the builder)641

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Irene by Sheth Creators and Sunvision Private Limited is a 643-unit SRA-sanctioned project in Malad West, Mumbai 400064, registered with MahaRERA in 2 phases, with possession dates from December 2025 to October 2028. 507 units booked out of total 643 units. The concrete structure (RCC) is 65% complete.

Read full summary

Irene is an SRA-sanctioned project by Sheth Creators and Sunvision Private Limited in Malad West, Mumbai 400064, registered with MahaRERA as 2 phases (P51800015507, P51800047209). The first phase was launched in March 2018. Together the phases have 643 units in 2 buildings, with 1 and 2 BHK homes as registered with MahaRERA. On MahaRERA, 1 is lapsed and 1 is active.

The phases' registered possession dates run from December 2025 to October 2028; no phase has an extended possession date. Across all phases, weighted by flats, the concrete structure (RCC) is 65% complete and final finishes 9% complete. Neither phase has its structure complete.

507 units booked out of total 643 units (79%).