Bindra Sateri Legacy C Wing And F Wing Phase I - Upto 10th Floor, Andheri East
Lapsed
by Bindra Sateri Constructions · Andheri East, Mumbai 400093 · Map
- Launched
- Jul 20184 yrs 5 mths originally promised
- Possession (MahaRERA)
- Dec 2023Extended by 1 yrWhat does Lapsed mean?
- Concrete structure
- 35%Mid-construction
- Booked
- 47 of 6770%
- Buildings
- 20.1 acres
- MahaRERA complaints
- 0Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 1 BHK
- 46
- 2 BHK
- 19
- Other units
- 2
- Total units
- 67
- Buildings
- 2
- Land
- 0.1 acres
- Phases
- 1
- MahaRERA complaints
- 0
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 35% | 0% | 47 | |
| 100% | 35% | 0% | – | |
| 100% | 35% | 0% | – | |
| 100% | 35% | 0% | 47 |
"–" means MahaRERA shows no figure for that update.
About this project
Bindra Sateri Legacy C Wing And F Wing Phase I - Upto 10th Floor by Bindra Sateri Constructions is a 67-unit project in Andheri East, Mumbai 400093, launched in July 2018; its MahaRERA registration has lapsed. 47 units booked out of total 67 units. The concrete structure (RCC) is 35% complete.
Read full summary
Bindra Sateri Legacy C Wing And F Wing Phase I - Upto 10th Floor is a project by Bindra Sateri Constructions in Andheri East, Mumbai 400093, registered with MahaRERA as P51800017120. It was launched in July 2018. It has 67 units in 2 buildings: 65 homes (1 and 2 BHK) and 2 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2023, after an extension of 1 year from the original December 2022. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) 35% complete, final finishes not started.
47 units booked out of total 67 units (70%).