Sateri Legacy B Wing Phase I- 2nd and above floors, Andheri East
Lapsed
by Bindra Sateri Constructions · Andheri East, Mumbai 400093 · Map
- Launched
- Mar 20203 yrs 9 mths promised
- Possession (MahaRERA)
- Dec 2023Not extendedWhat does Lapsed mean?
- Concrete structure
- 50%Mid-construction
- Booked
- –
- Buildings
- 10.1 acres
- MahaRERA complaints
- 0Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 1 BHK
- 53
- Total units
- 53
- Buildings
- 1
- Land
- 0.1 acres
- Phases
- 1
- MahaRERA complaints
- 0
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 50% | 0% | – | |
| 100% | 50% | 0% | – | |
| 100% | 50% | 0% | – | |
| 100% | 50% | 0% | 0 |
"–" means MahaRERA shows no figure for that update.
About this project
Sateri Legacy B Wing Phase I- 2nd and above floors by Bindra Sateri Constructions is a 53-unit project in Andheri East, Mumbai 400093, launched in March 2020; its MahaRERA registration has lapsed. The concrete structure (RCC) is 50% complete.
Read full summary
Sateri Legacy B Wing Phase I- 2nd and above floors is a project by Bindra Sateri Constructions in Andheri East, Mumbai 400093, registered with MahaRERA as P51800024998. It was launched in March 2020. It has 53 units in 1 building, with 1 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2023. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 50% complete, final finishes not started.