Bindra Sateri Legacy C Wing And F Wing Phase II - 11th And Above Floors, Andheri East

Lapsed

by Bindra Sateri Constructions · Andheri East, Mumbai 400093 · Map

Launched
Mar 20203 yrs 9 mths promised
Possession (MahaRERA)
Dec 2023Not extendedWhat does Lapsed mean?
Concrete structure
50%Mid-construction
Booked
–
Buildings
20.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
25
2 BHK
10
Total units
35
Buildings
2
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)50%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 50%Dec 2025: Concrete structure (RCC) 50%Jul 2026: Concrete structure (RCC) 50%Oct 2026: Concrete structure (RCC) 50%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 50%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%50%0%–
100%50%0%–
100%50%0%–
100%50%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Bindra Sateri Legacy C Wing And F Wing Phase II - 11th And Above Floors by Bindra Sateri Constructions is a 35-unit project in Andheri East, Mumbai 400093, launched in March 2020; its MahaRERA registration has lapsed. The concrete structure (RCC) is 50% complete.

Read full summary

Bindra Sateri Legacy C Wing And F Wing Phase II - 11th And Above Floors is a project by Bindra Sateri Constructions in Andheri East, Mumbai 400093, registered with MahaRERA as P51800025061. It was launched in March 2020. It has 35 units in 2 buildings, with 1 and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2023. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 50% complete, final finishes not started.