Skip to main content

Sainath Residency, Bhandup West

by Sainath Buildcon · Bhandup West, Mumbai 400078 · Map

Launched
Jul 20233 yrs 5 mths promised
Possession (MahaRERA)
Dec 2026Not extended
Concrete structure
58%Mid-construction
Booked
70 of 7396%
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
61
2 BHK
1
Other units
11
Total units
73
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)58%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 58%Dec 2025: Concrete structure (RCC) 58%Jul 2026: Concrete structure (RCC) 58%Oct 2026: Concrete structure (RCC) 58%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 58%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%58%0%70
100%58%0%70
100%58%0%–
100%58%0%6

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400078

Projects with 30–150 flats, launched within 1 year of this one.

Compared with 6 similar projects in PIN 400078
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 5 mths4 yrs 11 mths
Possession date extendedNo0 of 6
Possession date (MahaRERA)Dec 2026Jul 2028
Concrete structure (RCC)58%82%
Units booked96%78%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Sainath Residency by Sainath Buildcon is a 73-unit BMC-sanctioned project in Bhandup West, Mumbai 400078, launched in July 2023 with possession due in December 2026. 70 units booked out of total 73 units. The concrete structure (RCC) is 58% complete.

Read full summary

Sainath Residency is a BMC-sanctioned project by Sainath Buildcon in Bhandup West, Mumbai 400078, registered with MahaRERA as P51800051943. It was launched in July 2023. It has 73 units in 1 building: 62 homes (1 and 2 BHK) and 11 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, unchanged since launch. Construction: excavation complete, structure (RCC) 58% complete, final finishes not started.

70 units booked out of total 73 units (96%).