Proposed Red On Plot Bearing Fp No 40 Of Tps III Village Borivali West Mumbai, Borivali West

Ready to move

by Surbhi Midas Construction · Borivali West, Mumbai 400092 · Map

Launched
Aug 20231 yr 9 mths originally promised
Possession (MahaRERA)
Sep 2027Extended by 2 yrs 4 mths
Concrete structure
100%Ready to move
Booked (free sale)
5 of 1145% · 21 rehab units
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale5 booked out of 11 units

Rehab21 units for existing members

Total 32 units. Rehab units are not for sale.

Project facts

1 RK
7
1 BHK
15
2 BHK
8
3 BHK
1
Other units
1
Total units
32
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0
Free-sale units
11
Rehab units
21

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services90%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Oct 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 30%Dec 2025: Final finishes 30%Jul 2026: Final finishes 90%Oct 2026: Final finishes 90%Excavation 100%Concrete structure (RCC) 100%Final finishes 90%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%90%5
100%100%90%5
100%100%30%–
100%100%30%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400092

Projects with 10–70 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400092
MeasureThis projectSimilar projects
Launch to possession (as first promised)1 yr 9 mths2 yrs 6 mths
Possession date extendedBy 2 yrs 4 mths4 of 6
Possession date (MahaRERA)Sep 2027Dec 2026
Concrete structure (RCC)100%100%
Units booked (free sale)45%60%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Proposed Red On Plot Bearing Fp No 40 Of Tps III Village Borivali West Mumbai by Surbhi Midas Construction is a 32-unit BMC-sanctioned project in Borivali West, Mumbai 400092, launched in August 2023 with possession due in September 2027. 5 units booked out of 11 units for sale. The concrete structure (RCC) is complete.

Read full summary

Proposed Red On Plot Bearing Fp No 40 Of Tps III Village Borivali West Mumbai is a BMC-sanctioned project by Surbhi Midas Construction in Borivali West, Mumbai 400092, registered with MahaRERA as P51800052303. It was launched in August 2023. It has 32 units in 1 building: 31 homes (1 RK, 1 BHK, 2 BHK and 3 BHK) and 1 other unit (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active. Of the 32 units, 11 are for sale and 21 are rehab units for existing members.

Its registered possession date is September 2027, extended by 2 years 4 months from the original May 2025. Construction: excavation complete, structure (RCC) complete, final finishes 90% complete. Final finishes are 90% or more complete; completion has not yet been recorded on MahaRERA.

5 units booked out of 11 units for sale (45%).