Integrated Kavya, Andheri West

by Integrated Spaces Limited · Andheri West, Mumbai 400058 · Map

Launched
Sep 20233 yrs 9 mths promised
Possession (MahaRERA)
Jun 2027Not extended
Concrete structure
67%Mid-construction
Booked (free sale)
7 of 1937% · 9 rehab units
Buildings
20.8 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale7 booked out of 19 units

Rehab9 units for existing members

Total 28 units. Rehab units are not for sale.

Project facts

2 BHK
1
3 BHK
22
4 BHK
5
Total units
28
Buildings
2
Land
0.8 acres
Phases
1
MahaRERA complaints
0
Free-sale units
19
Rehab units
9

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)67%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 10%Dec 2025: Concrete structure (RCC) 60%Jul 2026: Concrete structure (RCC) 63%Oct 2026: Concrete structure (RCC) 67%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 67%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%67%0%7
100%63%0%3
100%60%0%2
100%10%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400058

Projects with 10–60 flats, launched within 6 months of this one.

Compared with 3 similar projects in PIN 400058
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 9 mths2 yrs 10 mths
Possession date extendedNo2 of 3
Possession date (MahaRERA)Jun 2027Sep 2027
Concrete structure (RCC)67%93%
Units booked (free sale)37%49%
MahaRERA complaints (filed by or against the builder)00

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Integrated Kavya by Integrated Spaces Limited is a 28-unit BMC-sanctioned project in Andheri West, Mumbai 400058, launched in September 2023 with possession due in June 2027. 7 units booked out of 19 units for sale. The concrete structure (RCC) is 67% complete.

Read full summary

Integrated Kavya is a BMC-sanctioned project by Integrated Spaces Limited in Andheri West, Mumbai 400058, registered with MahaRERA as P51800052486. It was launched in September 2023. It has 28 units in 2 buildings, with 2, 3 and 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Active. Of the 28 units, 19 are for sale and 9 are rehab units for existing members.

Its registered possession date is June 2027, unchanged since launch. Construction: excavation complete, structure (RCC) 67% complete, final finishes not started.

7 units booked out of 19 units for sale (37%). Since the July 2026 update, 4 more units have been booked and the reported concrete structure (RCC) has gone from 63% to 67%.