Ahmed Palace, Mandvi

Lapsed

by Azizur Rahman · Mandvi, Mumbai 400003 · Map

Launched
Aug 20173 yrs 4 mths promised
Possession (MahaRERA)
Dec 2020Not extendedWhat does Lapsed mean?
Concrete structure
50%Mid-construction
Booked
45 of 6371%
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

Other units
63
Total units
63
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)50%
Finishes, lifts and services25%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 50%Dec 2025: Concrete structure (RCC) 50%Jul 2026: Concrete structure (RCC) 50%Oct 2026: Concrete structure (RCC) 50%Dec 2024: Final finishes 25%Dec 2025: Final finishes 25%Jul 2026: Final finishes 25%Oct 2026: Final finishes 25%Excavation 100%Concrete structure (RCC) 50%Final finishes 25%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%50%25%45
100%50%25%–
100%50%25%–
100%50%25%45

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Ahmed Palace by Azizur Rahman is a 63-unit project in Mandvi, Mumbai 400003, launched in August 2017; its MahaRERA registration has lapsed. 45 units booked out of total 63 units. The concrete structure (RCC) is 50% complete.

Read full summary

Ahmed Palace is a project by Azizur Rahman in Mandvi, Mumbai 400003, registered with MahaRERA as P51900010675. It was launched in August 2017. It has 63 units in 1 building, as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2020. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 50% complete, final finishes 25% complete.

45 units booked out of total 63 units (71%).