Lakadawala Sapphire 19 To 22 Floor, Girgaon

Lapsed

by Sadique Anwar Koradia · Girgaon, Mumbai 400004 · Map

Launched
Aug 20171 yr 4 mths promised
Possession (MahaRERA)
Dec 2018Not extendedWhat does Lapsed mean?
Concrete structure
23%Mid-construction
Booked
5 of 862%
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
5
2 BHK
3
Total units
8
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation81%
Concrete structure (slabs)23%
Finishes, lifts and services81%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 81%Dec 2025: Excavation 81%Jul 2026: Excavation 81%Oct 2026: Excavation 81%Dec 2024: Concrete structure (RCC) 23%Dec 2025: Concrete structure (RCC) 23%Jul 2026: Concrete structure (RCC) 23%Oct 2026: Concrete structure (RCC) 23%Dec 2024: Final finishes 81%Dec 2025: Final finishes 81%Jul 2026: Final finishes 81%Oct 2026: Final finishes 81%Excavation 81%Final finishes 81%Concrete structure (RCC) 23%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
81%23%81%5
81%23%81%–
81%23%81%–
81%23%81%5

"–" means MahaRERA shows no figure for that update.

How to read construction stages

About this project

Lakadawala Sapphire 19 To 22 Floor by Sadique Anwar Koradia is an 8-unit project in Girgaon, Mumbai 400004, launched in August 2017; its MahaRERA registration has lapsed. 5 units booked out of total 8 units. The concrete structure (RCC) is 23% complete.

Read full summary

Lakadawala Sapphire 19 To 22 Floor is a project by Sadique Anwar Koradia in Girgaon, Mumbai 400004, registered with MahaRERA as P51900011194. It was launched in August 2017. It has 8 units in 1 building, with 1 and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2018. That date has passed and no extension has been recorded. Construction: excavation 81% complete, structure (RCC) 23% complete, final finishes 81% complete.

5 units booked out of total 8 units (62%).