Lakadawala Sapphire 19 To 22 Floor, Girgaon
Lapsed
by Sadique Anwar Koradia · Girgaon, Mumbai 400004 · Map
- Launched
- Aug 20171 yr 4 mths promised
- Possession (MahaRERA)
- Dec 2018Not extendedWhat does Lapsed mean?
- Concrete structure
- 23%Mid-construction
- Booked
- 5 of 862%
- Buildings
- 10.1 acres
- MahaRERA complaints
- 0Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 1 BHK
- 5
- 2 BHK
- 3
- Total units
- 8
- Buildings
- 1
- Land
- 0.1 acres
- Phases
- 1
- MahaRERA complaints
- 0
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 81% | 23% | 81% | 5 | |
| 81% | 23% | 81% | – | |
| 81% | 23% | 81% | – | |
| 81% | 23% | 81% | 5 |
"–" means MahaRERA shows no figure for that update.
About this project
Lakadawala Sapphire 19 To 22 Floor by Sadique Anwar Koradia is an 8-unit project in Girgaon, Mumbai 400004, launched in August 2017; its MahaRERA registration has lapsed. 5 units booked out of total 8 units. The concrete structure (RCC) is 23% complete.
Read full summary
Lakadawala Sapphire 19 To 22 Floor is a project by Sadique Anwar Koradia in Girgaon, Mumbai 400004, registered with MahaRERA as P51900011194. It was launched in August 2017. It has 8 units in 1 building, with 1 and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2018. That date has passed and no extension has been recorded. Construction: excavation 81% complete, structure (RCC) 23% complete, final finishes 81% complete.
5 units booked out of total 8 units (62%).