Ison Height, Lower Parel

by Hatdia Builders Pvt Ltd · Lower Parel, Mumbai 400013 · Map

Launched
Oct 20172 yrs 2 mths originally promised
Possession (MahaRERA)
Dec 2022Extended by 3 yrs
Concrete structure
85%Mid-construction
Booked
–
Buildings
10.5 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
40
Total units
40
Buildings
1
Land
0.5 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)85%
Finishes, lifts and services85%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 85%Dec 2025: Concrete structure (RCC) 85%Jul 2026: Concrete structure (RCC) 85%Dec 2024: Final finishes 85%Dec 2025: Final finishes 85%Jul 2026: Final finishes 85%Excavation 100%Concrete structure (RCC) 85%Final finishes 85%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%85%85%–
100%85%85%–
100%85%85%18

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400013

Projects with 20–80 flats, launched within 6 months of this one.

Compared with 3 similar projects in PIN 400013
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 2 mths2 yrs 5 mths
Possession date extendedBy 3 yrs3 of 3
Possession date (MahaRERA)Dec 2022Jun 2025
Concrete structure (RCC)85%100%
MahaRERA complaints (filed by or against the builder)00

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Ison Height by Hatdia Builders Pvt Ltd is a 40-unit project in Lower Parel, Mumbai 400013, launched in October 2017 with possession due in December 2022. The concrete structure (RCC) is 85% complete.

Read full summary

Ison Height is a project by Hatdia Builders Pvt Ltd in Lower Parel, Mumbai 400013, registered with MahaRERA as P51900013590. It was launched in October 2017. It has 40 units in 1 building, with 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Possession was due in December 2022, after an extension of 3 years from the original December 2019. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) 85% complete, final finishes 85% complete.