24KG Gold Residency, Chikhali

by Chaudhari Associates · Chikhali, Pune 411062 · Map

Launched
Sep 20232 yrs 9 mths originally promised
Possession (MahaRERA)
Oct 2027Extended by 1 yr 4 mths
Concrete structure
100%Nearing possession
Booked
13 of 2065%
Price per sq ft
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 RK
4
1 BHK
8
2 BHK
8
Total units
20
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress by tower

From the architect's Form 1 filed with MahaRERA. The last 4 updates per tower.

How construction has progressed

Each point is a progress report the builder's architect filed with MahaRERA (Form 1). A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Oct 2025Jun 2026Aug 2026Oct 2025: Excavation 100%Jun 2026: Excavation 100%Aug 2026: Excavation 100%Oct 2025: Concrete structure (RCC) 100%Jun 2026: Concrete structure (RCC) 100%Aug 2026: Concrete structure (RCC) 100%Oct 2025: Final finishes 0%Jun 2026: Final finishes 0%Aug 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 100%Final finishes 0%
Last 4 updates
Building
UpdateStructureFinishes
Aug 2026100%0%
Jun 2026100%0%
Oct 2025100%0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%0%13
0%0%0%–
0%0%0%–
0%0%0%–

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Construction cost spent

From the engineer's Form 2 filed with MahaRERA.

₹1.5 crore spent · latest estimate ₹2.6 crore · Aug 2026

Latest estimate ₹2.6 croreOct 2025: ₹94 lakh0.9Oct 2025Jun 2026: ₹1.5 crore1.5Jun 2026Aug 2026: ₹1.5 crore1.5Aug 2026
₹ crore spent
Spent at each update
UpdateSpent
Aug 2026₹1.5 crore
Jun 2026₹1.5 crore
Oct 2025₹94 lakh

Compared with 5 similar projects in PIN 411062

Projects with 10–40 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 411062
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 9 mths2 yrs 9 mths
Possession date extendedBy 1 yr 4 mths3 of 5
Possession date (MahaRERA)Oct 2027Dec 2026
Concrete structure (RCC)100%100%
Units booked65%25%
MahaRERA complaints (filed by or against the builder)00

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

24KG Gold Residency by Chaudhari Associates is a 20-unit project in Chikhali, Pune 411062, launched in September 2023 with possession due in October 2027. 13 units booked out of total 20 units. The concrete structure (RCC) is complete.

Read full summary

24KG Gold Residency is a project by Chaudhari Associates in Chikhali, Pune 411062, registered with MahaRERA as P52100052720. It was launched in September 2023. It has 20 units in 1 building, with 1 RK, 1 BHK and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is October 2027, extended by 1 year 4 months from the original June 2026. Construction: excavation complete, structure (RCC) complete, final finishes not started.

13 units booked out of total 20 units (65%). Since the July 2026 update, the reported concrete structure (RCC) has gone from 0% to 100% and the possession date has moved from June 2026 to October 2027.