Vidisha Sahakari Griharachana Sanstha Maryadit, Kothrud
by M/S ACE Space Redevelopment Private Limited. Kothrud, Pune 411038. View on Google Maps
- Launched
- 2 years 7 months promised
- Possession date (MahaRERA)
- 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 100%Nearing possession
- Units booked
- 2 of 297% booked
Project facts
| 1 RK | 1 |
|---|---|
| 1 BHK | 1 |
| 2 BHK | 15 |
| 3 BHK | 12 |
| Total units | 29 |
| Buildings | 1 |
| Land | 0.2 acres |
| Landowner share | 21 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 10 → 2 · structure 0% → 100% · total units 13 → 29
Compared with 6 similar projects in PIN 411038
Projects with 10–60 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 2 yrs 7 mths | 3 yrs |
| Possession date extended | No | 0 of 6 |
| Possession date (MahaRERA) | December 2026 | May 2027 |
| Concrete structure (RCC) complete | 100% | 75% |
| Share of units booked | 7% | 16% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Yashoda Apartment | May 2024 | March 2027 | 0% | Bookings not reported |
| Rajhans | June 2024 | May 2027 | 100% | 2 of 28 booked (7%) |
| Raghunath Society | June 2024 | December 2026 | 100% | 2 of 21 booked (10%) |
| Soumitra | June 2024 | December 2028 | 50% | 10 of 44 booked (23%) |
| Ashwamedh CHS | April 2024 | April 2027 | 100% | 21 of 58 booked (36%) |
| ULV Aspire | March 2024 | December 2027 | 0% | Bookings not reported |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 0% | 2 | |
| 0% | 0% | 0% | 10 |
"—" means MahaRERA shows no figure for that update.
About this project
Vidisha Sahakari Griharachana Sanstha Maryadit (MahaRERA P52100056418) is a residential project by M/S ACE Space Redevelopment Private Limited in Kothrud, Pune 411038. It was launched in May 2024. It has 29 units in 1 building, with 1 RK, 1 BHK, 2 BHK & 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, unchanged since launch. Construction: excavation complete, structure (RCC) complete, final finishes not started. MahaRERA records do not show it as ready to move in.
2 of its 29 units are booked (7%). Since the December 2025 update, the reported concrete structure (RCC) has gone from 0% to 100%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.