Basil Shivraj, Ambegaon Budruk
by Shree Sadguru Developers. Ambegaon Budruk, Pune 411046. View on Google Maps
- Launched
- 3 years 7 months promised
- Possession date (MahaRERA)
- 1 year 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 100%Nearing possession
- Units booked
- 83 of 13860% booked
Project facts
| 1 RK | 2 |
|---|---|
| 1 BHK | 32 |
| 2 BHK | 94 |
| Other units (shops, offices or not given by type) | 10 |
| Total units | 138 |
| Buildings | 1 |
| Land | 0.9 acres |
| Landowner share | 42 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 54 → 83 · structure 25% → 100% · final finishes 0% → 20%
Compared with 6 similar projects in PIN 411046
Projects with 60–300 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 3 yrs 7 mths | 4 yrs 5 mths |
| Possession date extended | No | 0 of 6 |
| Possession date (MahaRERA) | December 2027 | December 2028 |
| Concrete structure (RCC) complete | 100% | 74% |
| Share of units booked | 60% | 46% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Basil Vrundavan Wing E | May 2024 | April 2028 | 70% | 115 of 142 booked (81%) |
| Dhiraj Riseonic | April 2024 | March 2029 | 48% | 100 of 148 booked (68%) |
| Ivory Vista | April 2024 | June 2027 | 100% | 31 of 90 booked (34%) |
| Optima Aspire Plus | July 2024 | December 2028 | 60% | 43 of 146 booked (29%) |
| 4-Flamingos | July 2024 | December 2028 | 100% | 37 of 63 booked (59%) |
| Laxmi Greens | December 2023 | June 2030 | 78% | 46 of 153 booked (30%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 20% | 83 | |
| 100% | 25% | 0% | 54 | |
| 100% | 25% | 0% | 27 | |
| 50% | 5% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Basil Shivraj (MahaRERA P52100056439) is a residential project by Shree Sadguru Developers in Ambegaon Budruk, Pune 411046. It was launched in May 2024. It has 138 units in 1 building: 128 homes (1 RK, 1 BHK & 2 BHK) and 10 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2027, unchanged since launch. Construction: excavation complete, structure (RCC) complete, final finishes 20% complete. MahaRERA records do not show it as ready to move in.
83 of its 138 units are booked (60%). Since the December 2025 update, 29 more units have been booked and the reported concrete structure (RCC) has gone from 25% to 100%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.