Geo River Breeze, Charholi
by N K Buildcon. Charholi, Pune 412105. View on Google Maps
- Launched
- 3 years 5 months promised
- Possession date (MahaRERA)
- 1 year 1 month awayPossession date unchanged since launch
- Concrete structure (RCC)
- 85%Mid-constructionAverage across 2 buildings
- Units booked
- 35 of 5465% booked
Project facts
| 1 BHK | 10 |
|---|---|
| 2 BHK | 44 |
| Total units | 54 |
| Buildings | 2 |
| Land | 0.6 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 32 → 35 · structure 67% → 85% · final finishes 0% → 10%
Compared with 6 similar projects in PIN 412105
Projects with 20–150 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 3 yrs 5 mths | 3 yrs 2 mths |
| Possession date extended | No | 1 of 6 |
| Possession date (MahaRERA) | November 2027 | September 2027 |
| Concrete structure (RCC) complete | 85% | 80% |
| Share of units booked | 65% | 32% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Shantai | June 2024 | March 2027 | 100% | 50 of 56 booked (89%) |
| Bliss County Phase 3 | June 2024 | June 2027 | 0% | Bookings not reported |
| Sahyadri Plumeria Phase II | June 2024 | December 2028 | 45% | 15 of 66 booked (23%) |
| Anshul ELA F Building | July 2024 | April 2029 | 70% | 19 of 48 booked (40%) |
| Renuka Vista | July 2024 | December 2027 | 90% | Bookings not reported |
| Swami Classic | April 2024 | July 2026 | 100% | 2 of 42 booked (5%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 85% | 10% | 35 | |
| 100% | 67% | 0% | 32 | |
| 100% | 0% | 0% | 5 | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Geo River Breeze (MahaRERA P52100076636) is a residential project by N K Buildcon in Charholi, Pune 412105. It was launched in June 2024. It has 54 units in 2 buildings, with 1 & 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is November 2027, unchanged since launch. Construction, averaged across its 2 buildings: excavation complete, structure (RCC) 85% complete, final finishes 10% complete. MahaRERA records do not show it as ready to move in.
35 of its 54 units are booked (65%). Since the December 2025 update, 3 more units have been booked and the reported concrete structure (RCC) has gone from 67% to 85%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.