Optima Aspire, Ambegaon Budruk
by Optima Highrise. Ambegaon Budruk, Pune 411046. View on Google Maps
- Launched
- 3 years 2 months promised
- Possession date (MahaRERA)
- 1 year 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 93%Mid-constructionAverage across 2 buildings
- Units booked
- 59 of 23525% booked
Project facts
| 1 BHK | 45 |
|---|---|
| 2 BHK | 133 |
| Other units (shops, offices or not given by type) | 57 |
| Total units | 235 |
| Buildings | 2 |
| Land | 1 acre |
| Landowner share | 87 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 24 → 59 · structure 50% → 93% · final finishes 0% → 30% · total units 146 → 235
Compared with 5 similar projects in PIN 411046
Projects with 80–400 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 3 yrs 2 mths | 3 yrs 11 mths |
| Possession date extended | No | 0 of 5 |
| Possession date (MahaRERA) | December 2027 | April 2028 |
| Concrete structure (RCC) complete | 93% | 50% |
| Share of units booked | 25% | 52% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| One Residency Phase 2 | October 2024 | March 2027 | 50% | 83 of 217 booked (38%) |
| Emerald Skies | October 2024 | January 2028 | 40% | 53 of 102 booked (52%) |
| Optima Aspire Plus | July 2024 | December 2028 | 60% | 43 of 146 booked (29%) |
| Basil Vrundavan Wing E | May 2024 | April 2028 | 70% | 115 of 142 booked (81%) |
| Kohinoor B | March 2025 | February 2029 | 0% | 91 of 120 booked (76%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 93% | 30% | 59 | |
| 100% | 50% | 0% | 24 | |
| 100% | 0% | 0% | 2 |
"—" means MahaRERA shows no figure for that update.
About this project
Optima Aspire (MahaRERA P52100077712) is a residential project by Optima Highrise in Ambegaon Budruk, Pune 411046. It was launched in October 2024. It has 235 units in 2 buildings: 178 homes (1 & 2 BHK) and 57 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2027, unchanged since launch. Construction, averaged across its 2 buildings: excavation complete, structure (RCC) 93% complete, final finishes 30% complete. MahaRERA records do not show it as ready to move in.
59 of its 235 units are booked (25%). Since the December 2025 update, 35 more units have been booked and the reported concrete structure (RCC) has gone from 50% to 93%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.