Solitaire Palms B Wing, Borhadewadi
by Rajkumari Gulab Choithramani. Borhadewadi, Pune 412105. View on Google Maps
- Launched
- 6 years 1 month promised
- Possession date (MahaRERA)
- 4 years 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 15%Mid-construction
- Units booked
- 2 of 554% booked
Project facts
| 2 BHK | 55 |
|---|---|
| Total units | 55 |
| Buildings | 1 |
| Land | 0.5 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: structure 40% → 15%
Compared with 6 similar projects in PIN 412105
Projects with 20–150 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 6 yrs 1 mth | 3 yrs 4 mths |
| Possession date extended | No | 1 of 6 |
| Possession date (MahaRERA) | December 2030 | July 2028 |
| Concrete structure (RCC) complete | 15% | 8% |
| Share of units booked | 4% | 41% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Heritage | November 2024 | December 2026 | 10% | 30 of 58 booked (52%) |
| Radiance | November 2024 | September 2028 | 5% | 9 of 82 booked (11%) |
| Moraya Majestic | November 2024 | September 2028 | 0% | 43 of 105 booked (41%) |
| Signature Park | December 2024 | December 2028 | 0% | Bookings not reported |
| DLC WONDERNEST B Building | October 2024 | June 2028 | 20% | 35 of 63 booked (56%) |
| SMH Nakshatra | December 2024 | December 2026 | 55% | 8 of 42 booked (19%) |
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 15% | 0% | 2 | |
| 100% | 40% | 0% | 2 | |
| 40% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Solitaire Palms B Wing (MahaRERA P52100078115) is a residential project by Rajkumari Gulab Choithramani in Borhadewadi, Pune 412105. It was launched in November 2024. It has 55 units in 1 building, with 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2030, unchanged since launch. Construction: excavation complete, structure (RCC) 15% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
2 of its 55 units are booked (4%). Since the December 2025 update, the reported concrete structure (RCC) has gone from 40% to 15%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.