Vastu Imperia, Pimpri
by Pruthvi Developers and Builders. Pimpri, Pune 411018. View on Google Maps
- Launched
- 3 years 8 months promised
- Possession date (MahaRERA)
- 1 year 9 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 25%Mid-construction
- Units booked
- 34 of 11829% booked
Project facts
| 2 BHK | 37 |
|---|---|
| 3 BHK | 54 |
| Other units (shops, offices or not given by type) | 27 |
| Total units | 118 |
| Buildings | 1 |
| Land | 0.7 acres |
| Landowner share | 37 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 27 → 34 · structure 0% → 25% · total units 77 → 118
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 25% | 0% | 34 | |
| 100% | 0% | 0% | 27 | |
| 30% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Vastu Imperia (MahaRERA P52100078182) is a residential project by Pruthvi Developers and Builders in Pimpri, Pune 411018. It was launched in November 2024. It has 118 units in 1 building: 91 homes (2 & 3 BHK) and 27 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is July 2028, unchanged since launch. Construction: excavation complete, structure (RCC) 25% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
34 of its 118 units are booked (29%). Since the December 2025 update, 7 more units have been booked and the reported concrete structure (RCC) has gone from 0% to 25%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.