Optima Residency Proposed Residential building at Sr no 35/2/3/4 Kondhwa Pune, Kondhwa Khurd
by Vardhman Samruddhi. Kondhwa Khurd, Pune 411048. View on Google Maps
- Launched
- 3 years 10 months promised
- Possession date (MahaRERA)
- 2 years awayPossession date unchanged since launch
- Concrete structure (RCC)
- 0%Early stageAverage across 3 buildings
- Units booked
- 104 of 18058% booked
Project facts
| 1 BHK | 28 |
|---|---|
| 2 BHK | 117 |
| 3 BHK | 29 |
| Other units (shops, offices or not given by type) | 6 |
| Total units | 180 |
| Buildings | 3 |
| Land | 1.9 acres |
| Landowner share | 31 |
| Reserved units | 28 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Compared with 4 similar projects in PIN 411048
Projects with 80–350 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 3 yrs 10 mths | 4 yrs 4 mths |
| Possession date extended | No | 0 of 4 |
| Possession date (MahaRERA) | October 2028 | June 2029 |
| Concrete structure (RCC) complete | 0% | 2% |
| Share of units booked | 58% | 27% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Advik Greenscape- Wing B | November 2024 | December 2028 | 40% | 11 of 82 booked (13%) |
| Paras Parshwa Nagar II | April 2025 | December 2029 | 0% | 58 of 147 booked (39%) |
| TRU Meadows D | April 2025 | March 2028 | 0% | 18 of 120 booked (15%) |
| Privilege Hills C and D Building | July 2024 | December 2029 | 3% | 79 of 190 booked (42%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 30% | 0% | 0% | 104 | |
| 60% | 0% | 0% | — | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Optima Residency Proposed Residential building at Sr no 35/2/3/4 Kondhwa Pune (MahaRERA P52100078511) is a residential project by Vardhman Samruddhi in Kondhwa Khurd, Pune 411048. It was launched in December 2024. It has 180 units in 3 buildings: 174 homes (1, 2 & 3 BHK) and 6 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is October 2028, unchanged since launch. Construction, averaged across its 3 buildings: excavation 30% complete, structure (RCC) not started, final finishes not started. MahaRERA records do not show it as ready to move in.
104 of its 180 units are booked (58%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.