Aurum, Narhe
by M/S. Khandve Patil Constructions. Narhe, Pune 411041. View on Google Maps
- Launched
- 3 years 11 months promised
- Possession date (MahaRERA)
- 2 years 8 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 3%Mid-constructionAverage across 2 buildings
- Units booked
- Bookings not reported
Project facts
| 2 BHK | 55 |
|---|---|
| Other units (shops, offices or not given by type) | 12 |
| Total units | 67 |
| Buildings | 2 |
| Land | 0.7 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: structure 0% → 3%
Compared with 6 similar projects in PIN 411041
Projects with 20–150 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 3 yrs 11 mths | 3 yrs 8 mths |
| Possession date extended | No | 0 of 6 |
| Possession date (MahaRERA) | June 2029 | January 2029 |
| Concrete structure (RCC) complete | 3% | 25% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Venkatesh Skylife | June 2025 | March 2029 | 0% | 13 of 61 booked (21%) |
| Swa Kutumb | June 2025 | March 2029 | 20% | 1 of 45 booked (2%) |
| Kartavya Srushti | April 2025 | December 2028 | 60% | 9 of 56 booked (16%) |
| Alliance Sarthak | October 2025 | December 2029 | 0% | 5 of 45 booked (11%) |
| Yuvraj Residency | October 2025 | December 2027 | 85% | Bookings not reported |
| Riddhi Siddhi Imperia | March 2025 | December 2027 | 30% | 8 of 42 booked (19%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 3% | 0% | — | |
| 100% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Aurum (MahaRERA PM1260002500321) is a residential project by M/S. Khandve Patil Constructions in Narhe, Pune 411041. It was launched in July 2025. It has 67 units in 2 buildings: 55 homes (2 BHK) and 12 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is June 2029, unchanged since launch. Construction, averaged across its 2 buildings: excavation complete, structure (RCC) 3% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
It has not reported any bookings to MahaRERA yet. Since the December 2025 update, the reported concrete structure (RCC) has gone from 0% to 3%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.