Babar Classic Vista Wing A, B, C, D, Kondhwa Khurd
by Classic Properties. Kondhwa Khurd, Pune 411048. View on Google Maps
- Launched
- 4 years 9 months promised
- Possession date (MahaRERA)
- 4 years 5 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 0%Early stageAverage across 4 buildings
- Units booked
- Bookings not reported
Project facts
| 2 BHK | 466 |
|---|---|
| Other units (shops, offices or not given by type) | 6 |
| Total units | 472 |
| Buildings | 4 |
| Land | 3.8 acres |
| Landowner share | 191 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
Other phases of this project
About this project
Babar Classic Vista Wing A, B, C, D (MahaRERA PM1261012600704) is a residential project by Classic Properties in Kondhwa Khurd, Pune 411048. It was launched in June 2026, which makes it one of the newest launches in Kondhwa, Yewalewadi, Pisoli. It has 472 units in 4 buildings: 466 homes (2 BHK) and 6 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is March 2031, unchanged since launch. Construction, averaged across its 4 buildings: excavation not started, structure (RCC) not started, final finishes not started. MahaRERA records do not show it as ready to move in.
It has not reported any bookings to MahaRERA yet.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.