Skip to main content
← Back

Sairang Residency, Hadapsar

by A B Sai Groups. Hadapsar, Pune 411028. View on Google Maps

Launched
2 years 10 months promised
Possession date (MahaRERA)
1 year 7 months awayPossession date unchanged since launch
Concrete structure (RCC)
0%Early stage
Units booked
13 of 5026% booked

Project facts

1 BHK30
2 BHK20
Total units50
Buildings1
Land0.4 acres
Landowner share23
Complaints on MahaRERA (filed by or against the builder)0
Share on WhatsApp

Compared with 5 similar projects in PIN 411028

Projects with 20–100 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 411028
MeasureThis projectSimilar projects
Promised timeline (launch to possession)2 yrs 10 mths3 yrs 6 mths
Possession date extendedNo1 of 5
Possession date (MahaRERA)May 2028December 2028
Concrete structure (RCC) complete0%0%
Share of units booked26%19%
Complaints on MahaRERA (filed by or against the builder)00

"Similar projects" shows the typical (middle) value. Other phases of this project are not included.

Construction progress

As reported to MahaRERA at each update
Time used and structure built
1 year 3 months of the promised 2 years 10 months have passed
Concrete structure (RCC) 0% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Jun 2025Dec 2025Jul 2026Jun 2025: Excavation 20%Dec 2025: Excavation 20%Jul 2026: Excavation 20%Jun 2025: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 0%Jul 2026: Concrete structure (RCC) 0%Jun 2025: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Excavation 20%Concrete structure (RCC) 0%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
20%0%0%13

"—" means MahaRERA shows no figure for that update.

About this project

Sairang Residency (MahaRERA PR1260002500218) is a residential project by A B Sai Groups in Hadapsar, Pune 411028. It was launched in July 2025. It has 50 units in 1 building, with 1 & 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is May 2028, unchanged since launch. Construction: excavation 20% complete, structure (RCC) not started, final finishes not started. MahaRERA records do not show it as ready to move in.

13 of its 50 units are booked (26%).

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration PR1260002500218.Check it on MahaRERA (PR1260002500218)All projects in Hadapsar, Handewadi