Skip to main content

Basil Residency, Chembur

by Poseidon Realtors · Chembur, Mumbai 400089 · Map

Launched
Sep 20179 yrs 3 mths promised
Possession (MahaRERA)
Dec 2026Not extended
Concrete structure
0%Early stage
Booked
28 of 11225%
Buildings
10.4 acres
MahaRERA complaints
5Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
51
2 BHK
51
Other units
10
Total units
112
Buildings
1
Land
0.4 acres
Phases
1
MahaRERA complaints
5

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation0%
Concrete structure (slabs)0%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Work not started as of Oct 2026

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
0%0%0%28
0%0%0%–
0%0%0%–
0%0%0%28

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400089

Projects with 50–250 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400089
MeasureThis projectSimilar projects
Launch to possession (as first promised)9 yrs 3 mths3 yrs 2 mths
Possession date extendedNo6 of 6
Possession date (MahaRERA)Dec 2026Mar 2026
Concrete structure (RCC)0%75%
Units booked25%91%
MahaRERA complaints (filed by or against the builder)511

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Basil Residency by Poseidon Realtors is a 112-unit project in Chembur, Mumbai 400089, launched in September 2017 with possession due in December 2026. 28 units booked out of total 112 units. Work on the concrete structure (RCC) has not started.

Read full summary

Basil Residency is a project by Poseidon Realtors in Chembur, Mumbai 400089, registered with MahaRERA as P51800012947. It was launched in September 2017. It has 112 units in 1 building: 102 homes (1 and 2 BHK) and 10 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, unchanged since launch. Construction: excavation not started, structure (RCC) not started, final finishes not started.

28 units booked out of total 112 units (25%).