Puneet Prime Phase 2 Floor 3 To Floor 16, Kurla East

Lapsed

by Puneet Builders · Kurla East, Mumbai 400024 · Map

Launched
May 20196 yrs 1 mth promised
Possession (MahaRERA)
Jun 2025Not extendedWhat does Lapsed mean?
Concrete structure
100%Nearing possession
Booked
68 of 68100%
Buildings
10.3 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 RK
26
1 BHK
15
2 BHK
26
3 BHK
1
Total units
68
Buildings
1
Land
0.3 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services6%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Oct 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 6%Dec 2025: Final finishes 6%Jul 2026: Final finishes 6%Oct 2026: Final finishes 6%Excavation 100%Concrete structure (RCC) 100%Final finishes 6%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%6%68
100%100%6%–
100%100%6%–
100%100%6%68

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 5 similar projects in PIN 400024

Projects with 30–150 flats, launched within 1 year of this one.

Compared with 5 similar projects in PIN 400024
MeasureThis projectSimilar projects
Launch to possession (as first promised)6 yrs 1 mth5 yrs 8 mths
Possession date extendedNo4 of 5
Possession date (MahaRERA)Jun 2025Dec 2025
Concrete structure (RCC)100%78%
Units booked100%68%
MahaRERA complaints (filed by or against the builder)01

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

Puneet Prime Phase 2 Floor 3 To Floor 16 by Puneet Builders is a 68-unit MHADA-sanctioned project in Kurla East, Mumbai 400024, launched in May 2019; its MahaRERA registration has lapsed. 68 units booked out of total 68 units. The concrete structure (RCC) is complete.

Read full summary

Puneet Prime Phase 2 Floor 3 To Floor 16 is a MHADA-sanctioned project by Puneet Builders in Kurla East, Mumbai 400024, registered with MahaRERA as P51800020753. It was launched in May 2019. It has 68 units in 1 building, with 1 RK, 1 BHK, 2 BHK and 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in June 2025. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 6% complete.

68 units booked out of total 68 units (100%).