Durgamata House, Bandra West
Lapsed
by Zulfiqar Haider Safdar Sayyed · Bandra West, Mumbai 400050 · Map
- Launched
- Mar 20201 yr 9 mths promised
- Possession (MahaRERA)
- Dec 2021Not extendedWhat does Lapsed mean?
- Concrete structure
- 100%Nearing possession
- Booked
- –
- Buildings
- 10.1 acres
- MahaRERA complaints
- 1Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 1 BHK
- 24
- Total units
- 24
- Buildings
- 1
- Land
- 0.1 acres
- Phases
- 1
- MahaRERA complaints
- 1
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 10% | – | |
| 100% | 100% | 10% | – | |
| 100% | 100% | 10% | – | |
| 100% | 100% | 10% | 0 |
"–" means MahaRERA shows no figure for that update.
Compared with 3 similar projects in PIN 400050
Projects with 10–50 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Launch to possession (as first promised) | 1 yr 9 mths | 5 yrs 9 mths |
| Possession date extended | No | 2 of 3 |
| Possession date (MahaRERA) | Dec 2021 | Nov 2027 |
| Concrete structure (RCC) | 100% | 0% |
| MahaRERA complaints (filed by or against the builder) | 1 | 1 |
The 3 projects
- Palihill, Bandra West
- Urban Waterfront, Bandra West
- Urban Waves, Bandra West
Other phases of this project are not included in the similar projects.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Palihill | November 2019 | August 2025 | 0% | – |
| Urban Waterfront | September 2020 | December 2031 | 0% | 11 units booked out of total 26 units |
| Urban Waves | September 2020 | November 2027 | 38% | 21 units booked out of total 34 units |
About this project
Durgamata House by Zulfiqar Haider Safdar Sayyed is a 24-unit project in Bandra West, Mumbai 400050, launched in March 2020; its MahaRERA registration has lapsed. The concrete structure (RCC) is complete.
Read full summary
Durgamata House is a project by Zulfiqar Haider Safdar Sayyed in Bandra West, Mumbai 400050, registered with MahaRERA as P51800024880. It was launched in March 2020. It has 24 units in 1 building, with 1 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2021. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 10% complete.