Vaayu, Dahisar

by Kolte-Patil Developers Limited · Dahisar, Mumbai 400068 · Map

Launched
Apr 20213 yrs 9 mths originally promised
Possession (MahaRERA)
Apr 2027Extended by 2 yrs 3 mths
Concrete structure
75%Mid-construction
Booked
113 of 16170%
Buildings
41.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
161
Total units
161
Buildings
4
Land
1.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation75%
Concrete structure (slabs)75%
Finishes, lifts and services75%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 75%Dec 2025: Excavation 75%Jul 2026: Excavation 75%Oct 2026: Excavation 75%Dec 2024: Concrete structure (RCC) 75%Dec 2025: Concrete structure (RCC) 75%Jul 2026: Concrete structure (RCC) 75%Oct 2026: Concrete structure (RCC) 75%Dec 2024: Final finishes 69%Dec 2025: Final finishes 75%Jul 2026: Final finishes 75%Oct 2026: Final finishes 75%Excavation 75%Concrete structure (RCC) 75%Final finishes 75%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
75%75%75%113
75%75%75%113
75%75%75%–
75%75%69%206

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 5 similar projects in PIN 400068

Projects with 80–350 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 400068
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 9 mths3 yrs 8 mths
Possession date extendedBy 2 yrs 3 mths4 of 5
Possession date (MahaRERA)Apr 2027Apr 2026
Concrete structure (RCC)75%0%
Units booked70%50%
MahaRERA complaints (filed by or against the builder)00

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

Vaayu by Kolte-Patil Developers Limited is a 161-unit BMC-sanctioned project in Dahisar, Mumbai 400068, launched in April 2021 with possession due in April 2027. 113 units booked out of total 161 units. The concrete structure (RCC) is 75% complete.

Read full summary

Vaayu is a BMC-sanctioned project by Kolte-Patil Developers Limited in Dahisar, Mumbai 400068, registered with MahaRERA as P51800029034. It was launched in April 2021. It has 161 units in 4 buildings, with 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is April 2027, extended by 2 years 3 months from the original January 2025. Construction: excavation 75% complete, structure (RCC) 75% complete, final finishes 75% complete.

113 units booked out of total 161 units (70%).