Om Gautam Residency, Malad East

Lapsed

by Atharva Rise · Malad East, Mumbai 400097 · Map

Launched
Jun 20222 yrs originally promised
Possession (MahaRERA)
Jun 2025Extended by 1 yrWhat does Lapsed mean?
Concrete structure
100%Nearing possession
Booked (free sale)
36 of 36100% · 28 rehab units
Buildings
20.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale36 booked out of 36 units

Rehab28 units for existing members

Total 64 units. Rehab units are not for sale.

Project facts

1 BHK
32
2 BHK
32
Total units
64
Buildings
2
Land
0.2 acres
Phases
1
MahaRERA complaints
0
Free-sale units
36
Rehab units
28

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services80%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Oct 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 50%Dec 2025: Final finishes 50%Jul 2026: Final finishes 50%Oct 2026: Final finishes 80%Excavation 100%Concrete structure (RCC) 100%Final finishes 80%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%80%36
100%100%50%–
100%100%50%–
100%100%50%8

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400097

Projects with 30–150 flats, launched within 1 year of this one.

Compared with 3 similar projects in PIN 400097
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs3 yrs 3 mths
Possession date extendedBy 1 yr2 of 3
Possession date (MahaRERA)Jun 2025Dec 2026
Concrete structure (RCC)100%75%
Units booked (free sale)100%80%
MahaRERA complaints (filed by or against the builder)00

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Om Gautam Residency by Atharva Rise is a 64-unit BMC-sanctioned project in Malad East, Mumbai 400097, launched in June 2022; its MahaRERA registration has lapsed. 36 units booked out of 36 units for sale. The concrete structure (RCC) is complete.

Read full summary

Om Gautam Residency is a BMC-sanctioned project by Atharva Rise in Malad East, Mumbai 400097, registered with MahaRERA as P51800046074. It was launched in June 2022. It has 64 units in 2 buildings, with 1 and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed. Of the 64 units, 36 are for sale and 28 are rehab units for existing members.

Possession was due in June 2025, after an extension of 1 year from the original June 2024. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 80% complete.

36 units booked out of 36 units for sale (100%).