Unique Enclave Residency, Vikhroli

by Fazal Shaikh · Vikhroli, Mumbai 400083 · Map

Launched
Jun 20233 yrs 3 mths promised
Possession (MahaRERA)
Sep 2026Not extended
Concrete structure
21%Mid-construction
Booked
43 of 11836%
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
63
2 BHK
48
Other units
7
Total units
118
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)21%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 21%Dec 2025: Concrete structure (RCC) 21%Jul 2026: Concrete structure (RCC) 21%Oct 2026: Concrete structure (RCC) 21%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 21%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%21%0%43
100%21%0%–
100%21%0%–
100%21%0%43

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 5 similar projects in PIN 400083

Projects with 50–250 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 400083
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 3 mths3 yrs 7 mths
Possession date extendedNo0 of 5
Possession date (MahaRERA)Sep 2026Dec 2026
Concrete structure (RCC)21%100%
Units booked36%66%
MahaRERA complaints (filed by or against the builder)00

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

Unique Enclave Residency by Fazal Shaikh is a 118-unit project in Vikhroli, Mumbai 400083, launched in June 2023 with possession due in September 2026. 43 units booked out of total 118 units. The concrete structure (RCC) is 21% complete.

Read full summary

Unique Enclave Residency is a project by Fazal Shaikh in Vikhroli, Mumbai 400083, registered with MahaRERA as P51800051637. It was launched in June 2023. It has 118 units in 1 building: 111 homes (1 and 2 BHK) and 7 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Possession was due in September 2026. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 21% complete, final finishes not started.

43 units booked out of total 118 units (36%).