Sagar Sangeet Chs Adityaraj Paradise, Vikhroli

by Adityaraj Housing Developers · Vikhroli, Mumbai 400083 · Map

Launched
Jun 20233 yrs 6 mths promised
Possession (MahaRERA)
Dec 2026Not extended
Concrete structure
100%Nearing possession
Booked
65 of 13050%
Buildings
10.3 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
70
3 BHK
40
Other units
20
Total units
130
Buildings
1
Land
0.3 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services65%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 8%Dec 2025: Concrete structure (RCC) 8%Jul 2026: Concrete structure (RCC) 100%Oct 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 40%Oct 2026: Final finishes 65%Excavation 100%Concrete structure (RCC) 100%Final finishes 65%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%65%65
100%100%40%–
100%8%0%–
100%8%0%65

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 4 similar projects in PIN 400083

Projects with 50–250 flats, launched within 6 months of this one.

Compared with 4 similar projects in PIN 400083
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 6 mths3 yrs 6 mths
Possession date extendedNo0 of 4
Possession date (MahaRERA)Dec 2026Dec 2026
Concrete structure (RCC)100%74%
Units booked50%64%
MahaRERA complaints (filed by or against the builder)00

The 4 projects

Other phases of this project are not included in the similar projects.

About this project

Sagar Sangeet Chs Adityaraj Paradise by Adityaraj Housing Developers is a 130-unit MHADA-sanctioned project in Vikhroli, Mumbai 400083, launched in June 2023 with possession due in December 2026. 65 units booked out of total 130 units. The concrete structure (RCC) is complete.

Read full summary

Sagar Sangeet Chs Adityaraj Paradise is a MHADA-sanctioned project by Adityaraj Housing Developers in Vikhroli, Mumbai 400083, registered with MahaRERA as P51800051660. It was launched in June 2023. It has 130 units in 1 building: 110 homes (2 and 3 BHK) and 20 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, unchanged since launch. Construction: excavation complete, structure (RCC) complete, final finishes 65% complete.

65 units booked out of total 130 units (50%).

Adityaraj's track record in Mumbai

MahaRERA projects registered 2017–2026 in Mumbai

Projects registered with MahaRERA29
Total units across these projects3,149
Completed without extending the possession date7
Completed after an extension2
Lapsed10
Under construction10
Possession date extended on the builder's application2
Typical time from launch to 100% structure3 years 6 months
MahaRERA complaints (filed by or against the builder), all Adityaraj projects2 (2 of 29 projects)

See all Adityaraj projects →