A. M. Residency, Mazgaon

by Alfa Mana Realtors Pvt Ltd · Mazgaon, Mumbai 400010 · Map

Launched
Jun 20173 yrs 3 mths promised
Possession (MahaRERA)
Sep 2020Not extended
Concrete structure
67%Mid-construction
Booked (free sale)
189 of 22584% · 120 rehab units
Buildings
20.9 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale189 booked out of 225 units

Rehab120 units for existing members

Total 345 units. Rehab units are not for sale.

Project facts

1 BHK
224
2 BHK
81
3 BHK
24
5+ BHK
1
Other units
15
Total units
345
Buildings
2
Land
0.9 acres
Phases
1
MahaRERA complaints
0
Free-sale units
225
Rehab units
120
Reserved units
61

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation67%
Concrete structure (slabs)67%
Finishes, lifts and services67%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 67%Jul 2026: Excavation 67%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 67%Jul 2026: Concrete structure (RCC) 67%Dec 2024: Final finishes 100%Dec 2025: Final finishes 67%Jul 2026: Final finishes 67%Excavation 67%Concrete structure (RCC) 67%Final finishes 67%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
67%67%67%189
67%67%67%189
100%100%100%10

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 4 similar projects in PIN 400010

Projects with 150–700 flats, launched within 6 months of this one.

Compared with 4 similar projects in PIN 400010
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 3 mths6 yrs 4 mths
Possession date extendedNo4 of 4
Possession date (MahaRERA)Sep 2020Aug 2029
Concrete structure (RCC)67%72%
Units booked (free sale)84%79%
MahaRERA complaints (filed by or against the builder)00

The 4 projects

Other phases of this project are not included in the similar projects.

About this project

A. M. Residency by Alfa Mana Realtors Pvt Ltd is a 345-unit BMC-sanctioned project in Mazgaon, Mumbai 400010, launched in June 2017 with possession due in September 2020. 189 units booked out of 225 units for sale. The concrete structure (RCC) is 67% complete.

Read full summary

A. M. Residency is a BMC-sanctioned project by Alfa Mana Realtors Pvt Ltd in Mazgaon, Mumbai 400010, registered with MahaRERA as P51900000070. It was launched in June 2017. It has 345 units in 2 buildings: 330 homes (1, 2, 3 and 5+ BHK) and 15 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active. Of the 345 units, 225 are for sale and 120 are rehab units for existing members.

Possession was due in September 2020. That date has passed and no extension has been recorded. Construction: excavation 67% complete, structure (RCC) 67% complete, final finishes 67% complete.

189 units booked out of 225 units for sale (84%).