- Launched
- Sep 20176 yrs 3 mths promised
- Possession (MahaRERA)
- Dec 2023Not extendedWhat does Lapsed mean?
- Concrete structure
- 18%Mid-construction
- Booked
- 35 of 22216%
- Buildings
- 12.8 acres
- MahaRERA complaints
- 0Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 2 BHK
- 124
- 3 BHK
- 82
- 4 BHK
- 16
- Total units
- 222
- Buildings
- 1
- Land
- 2.8 acres
- Phases
- 1
- MahaRERA complaints
- 0
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 20% | 18% | 0% | 35 | |
| 20% | 18% | 0% | – | |
| 20% | 18% | 0% | – | |
| 20% | 18% | 0% | 35 |
"–" means MahaRERA shows no figure for that update.
Compared with 3 similar projects in PIN 400037
Projects with 100–450 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Launch to possession (as first promised) | 6 yrs 3 mths | 6 yrs 4 mths |
| Possession date extended | No | 1 of 3 |
| Possession date (MahaRERA) | Dec 2023 | Dec 2024 |
| Concrete structure (RCC) | 18% | 55% |
| MahaRERA complaints (filed by or against the builder) | 0 | 1 |
The 3 projects
- Maaria Annexe, Wadala East
- Wadala, Wadala East
- Ajmera Treon, Wadala East
Other phases of this project are not included in the similar projects.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Maaria Annexe | August 2017 | December 2029 | 85% | 72 units booked out of total 159 units |
| Wadala | August 2017 | December 2023 | 0% | 52 units booked out of total 133 units |
| Ajmera Treon | July 2017 | December 2024 | 55% | – |
About this project
Zeus Residency Sale Bldg No.6 by Balwant Doshi is a 222-unit project in Wadala East, Mumbai 400037, launched in September 2017; its MahaRERA registration has lapsed. 35 units booked out of total 222 units. The concrete structure (RCC) is 18% complete.
Read full summary
Zeus Residency Sale Bldg No.6 is a project by Balwant Doshi in Wadala East, Mumbai 400037, registered with MahaRERA as P51900011984. It was launched in September 2017. It has 222 units in 1 building, with 2, 3 and 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2023. That date has passed and no extension has been recorded. Construction: excavation 20% complete, structure (RCC) 18% complete, final finishes not started.
35 units booked out of total 222 units (16%).