Orbit Terraces, Lower Parel

Lapsed

by Orbit Corporation Ltd · Lower Parel, Mumbai 400013 · Map

Launched
Oct 20176 yrs 2 mths promised
Possession (MahaRERA)
Dec 2023Not extendedWhat does Lapsed mean?
Concrete structure
60%Mid-construction
Booked
140 of 140100%
Buildings
11.5 acres
MahaRERA complaints
1Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
24
3 BHK
64
4 BHK
32
Other units
20
Total units
140
Buildings
1
Land
1.5 acres
Phases
1
MahaRERA complaints
1

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)60%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 60%Dec 2025: Concrete structure (RCC) 60%Jul 2026: Concrete structure (RCC) 60%Oct 2026: Concrete structure (RCC) 60%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 60%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%60%0%140
100%60%0%–
100%60%0%–
100%60%0%140

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400013

Projects with 60–250 flats, launched within 6 months of this one.

Compared with 3 similar projects in PIN 400013
MeasureThis projectSimilar projects
Launch to possession (as first promised)6 yrs 2 mths4 yrs 4 mths
Possession date extendedNo3 of 3
Possession date (MahaRERA)Dec 2023Dec 2025
Concrete structure (RCC)60%60%
Units booked100%60%
MahaRERA complaints (filed by or against the builder)11

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Orbit Terraces by Orbit Corporation Ltd is a 140-unit project in Lower Parel, Mumbai 400013, launched in October 2017; its MahaRERA registration has lapsed. 140 units booked out of total 140 units. The concrete structure (RCC) is 60% complete.

Read full summary

Orbit Terraces is a project by Orbit Corporation Ltd in Lower Parel, Mumbai 400013, registered with MahaRERA as P51900013466. It was launched in October 2017. It has 140 units in 1 building: 120 homes (1, 3 and 4 BHK) and 20 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2023. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 60% complete, final finishes not started.

140 units booked out of total 140 units (100%).