Bhoiwada Chandra Bhuvan CHS Ltd, Parel

by Avadhoot Techno Consultant And Engineers · Parel, Mumbai 400012 · Map

Launched
Dec 20233 yrs promised
Possession (MahaRERA)
Dec 2026Not extended
Concrete structure
0%Early stage
Booked
–
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
8
2 BHK
47
Other units
5
Total units
60
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)0%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 0%Jul 2026: Concrete structure (RCC) 0%Oct 2026: Concrete structure (RCC) 0%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 0%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%0%0%–
100%0%0%–
100%0%0%–
100%0%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 4 similar projects in PIN 400012

Projects with 20–150 flats, launched within 6 months of this one.

Compared with 4 similar projects in PIN 400012
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs3 yrs 10 mths
Possession date extendedNo0 of 4
Possession date (MahaRERA)Dec 2026Jan 2028
Concrete structure (RCC)0%62%
Units booked–86%
MahaRERA complaints (filed by or against the builder)00

The 4 projects

Other phases of this project are not included in the similar projects.

About this project

Bhoiwada Chandra Bhuvan CHS Ltd by Avadhoot Techno Consultant And Engineers is a 60-unit BMC-sanctioned project in Parel, Mumbai 400012, launched in December 2023 with possession due in December 2026. Work on the concrete structure (RCC) has not started.

Read full summary

Bhoiwada Chandra Bhuvan CHS Ltd is a BMC-sanctioned project by Avadhoot Techno Consultant And Engineers in Parel, Mumbai 400012, registered with MahaRERA as P51900053967. It was launched in December 2023. It has 60 units in 1 building: 55 homes (1 and 2 BHK) and 5 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, unchanged since launch. Construction: excavation complete, structure (RCC) not started, final finishes not started.