Construction of Building No 04 consisting of single wing comprising of Stilt 5P 33 floors 128 Ts, Borivali East

by Mumbai Housing And Area Development Board · Borivali East, Mumbai 400066 · Map

Launched
Mar 20262 yrs 7 mths promised
Possession (MahaRERA)
Oct 2028Not extended
Concrete structure
35%Mid-construction
Booked
0 of 1280%
Buildings
13.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

3 BHK
128
Total units
128
Buildings
1
Land
3.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)35%
Finishes, lifts and services0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%35%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400066

Projects with 60–300 flats, launched within 1 year of this one.

Compared with 6 similar projects in PIN 400066
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 7 mths4 yrs 9 mths
Possession date extendedNo0 of 6
Possession date (MahaRERA)Oct 2028Jul 2030
Concrete structure (RCC)35%0%
Units booked0%28%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Construction of Building No 04 consisting of single wing comprising of Stilt 5P 33 floors 128 Ts by Mumbai Housing And Area Development Board is a 128-unit MHADA-sanctioned project in Borivali East, Mumbai 400066, launched in March 2026 with possession due in October 2028. 0 units booked out of total 128 units. The concrete structure (RCC) is 35% complete.

Read full summary

Construction of Building No 04 consisting of single wing comprising of Stilt 5P 33 floors 128 Ts is a MHADA-sanctioned project by Mumbai Housing And Area Development Board in Borivali East, Mumbai 400066, registered with MahaRERA as PR1181012502963. It was launched in March 2026. It has 128 units in 1 building, with 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is October 2028, unchanged since launch. Construction: excavation complete, structure (RCC) 35% complete, final finishes not started.

0 units booked out of total 128 units (0%).