Skip to main content
← Back

Marvel Isola J Building, Mohammadwadi

Lapsed

by Marvel Landmarks PVT Ltd. Mohammadwadi, Pune 411028. View on Google Maps

Launched
3 years 11 months originally promised
Possession date (MahaRERA)
1 year 10 months ago. No further extension recordedExtended by 3 years 6 months (originally June 2021). What "Lapsed" means
Concrete structure (RCC)
100%Nearing possession
Units booked
43 of 4498% booked

Project facts

4 BHK44
Total units44
Buildings1
Land1.2 acres
Complaints on MahaRERA (filed by or against the builder)26

Since Dec 2025: booked 42 → 43 · final finishes 28% → 35%

Share on WhatsApp

Construction progress

As reported to MahaRERA at each update
Time used and structure built
All of the originally promised 3 years 11 months have passed
Concrete structure (RCC) 100% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 100%Jun 2024: Excavation 100%Dec 2024: Excavation 100%Jun 2025: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2023: Concrete structure (RCC) 90%Jun 2024: Concrete structure (RCC) 90%Dec 2024: Concrete structure (RCC) 92%Jun 2025: Concrete structure (RCC) 92%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Dec 2023: Final finishes 13%Jun 2024: Final finishes 13%Dec 2024: Final finishes 18%Jun 2025: Final finishes 18%Dec 2025: Final finishes 28%Jul 2026: Final finishes 35%Excavation 100%Concrete structure (RCC) 100%Final finishes 35%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%35%43
100%100%28%42
100%92%18%41
100%90%13%26
100%90%13%22

"—" means MahaRERA shows no figure for that update.

About this project

Marvel Isola J Building (MahaRERA P52100001843) is a residential project by Marvel Landmarks PVT Ltd in Mohammadwadi, Pune 411028. It was launched in July 2017. It has 44 units in 1 building, with 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2024, after an extension of 3 years 6 months from the original June 2021. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 35% complete. MahaRERA records do not show it as ready to move in.

43 of its 44 units are booked (98%). Since the December 2025 update, 1 more unit has been booked.

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100001843.Check it on MahaRERA (P52100001843)All projects in Hadapsar, Handewadi