Skylights, Wagholi

by Ravinanda Landmarks. Wagholi, Pune 412207. View on Google Maps

Launched
6 years 4 months originally promised
Possession date (MahaRERA)
1 year 10 months ago. No further extension recordedExtended by 1 year (originally December 2023). Why possession dates change
Concrete structure (RCC)
44%Mid-constructionAverage across 8 buildings
Units booked
389 of 47981% booked

Project facts

1 BHK58
2 BHK418
Other units (shops, offices or not given by type)3
Total units479
Buildings8
Land9.3 acres
Complaints on MahaRERA (filed by or against the builder)78
Share on WhatsApp

Construction progress

As reported to MahaRERA at each update
Time used and structure built
All of the originally promised 6 years 4 months have passed
Concrete structure (RCC) 44% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 59%Jun 2024: Excavation 63%Dec 2024: Excavation 63%Jun 2025: Excavation 63%Dec 2025: Excavation 63%Jul 2026: Excavation 63%Dec 2023: Concrete structure (RCC) 41%Jun 2024: Concrete structure (RCC) 46%Dec 2024: Concrete structure (RCC) 46%Jun 2025: Concrete structure (RCC) 46%Dec 2025: Concrete structure (RCC) 44%Jul 2026: Concrete structure (RCC) 44%Dec 2023: Final finishes 24%Jun 2024: Final finishes 38%Dec 2024: Final finishes 38%Jun 2025: Final finishes 38%Dec 2025: Final finishes 33%Jul 2026: Final finishes 33%Excavation 63%Concrete structure (RCC) 44%Final finishes 33%

If a percentage drops between updates, we show it as MahaRERA reported it.

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
63%44%33%389
63%46%38%389
59%41%24%382

"—" means MahaRERA shows no figure for that update.

About this project

Skylights (MahaRERA P52100003645) is a residential project by Ravinanda Landmarks in Wagholi, Pune 412207. It was launched in August 2017. It has 479 units in 8 buildings: 476 homes (1 & 2 BHK) and 3 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Possession was due in December 2024, after an extension of 1 year from the original December 2023. That date has passed and no further extension has been recorded. Construction, averaged across its 8 buildings: excavation 63% complete, structure (RCC) 44% complete, final finishes 33% complete. MahaRERA records do not show it as ready to move in.

389 of its 479 units are booked (81%).

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100003645.Check it on MahaRERA (P52100003645)All projects in Wagholi