Atharva Shrushti Wing B and C, Manjari Khurd

by Atharva Buildcon. Manjari Khurd, Pune 412307. View on Google Maps

Launched
5 years 11 months originally promised
Possession date (MahaRERA)
1 year 6 months ago. No further extension recordedExtended by 1 year (originally April 2024). Why possession dates change
Concrete structure (RCC)
40%Mid-constructionAverage across 5 buildings
Units booked
92 of 23938% booked

Project facts

1 BHK130
2 BHK88
Other units (shops, offices or not given by type)21
Total units239
Buildings5
Land4.5 acres
Landowner share127
Complaints on MahaRERA (filed by or against the builder)1

Since Dec 2025: booked 84 → 92 · structure 100% → 40% · final finishes 50% → 20% · total units 218 → 239

Share on WhatsApp

Construction progress

As reported to MahaRERA at each update
Time used and structure built
All of the originally promised 5 years 11 months have passed
Concrete structure (RCC) 40% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 100%Jun 2024: Excavation 100%Dec 2024: Excavation 100%Jun 2025: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 40%Dec 2023: Concrete structure (RCC) 88%Jun 2024: Concrete structure (RCC) 100%Dec 2024: Concrete structure (RCC) 100%Jun 2025: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 40%Dec 2023: Final finishes 25%Jun 2024: Final finishes 50%Dec 2024: Final finishes 50%Jun 2025: Final finishes 50%Dec 2025: Final finishes 50%Jul 2026: Final finishes 20%Excavation 40%Concrete structure (RCC) 40%Final finishes 20%

If a percentage drops between updates, we show it as MahaRERA reported it.

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
40%40%20%92
100%100%50%84
100%100%50%72
100%88%25%65

"—" means MahaRERA shows no figure for that update.

About this project

Atharva Shrushti Wing B and C (MahaRERA P52100016289) is a residential project by Atharva Buildcon in Manjari Khurd, Pune 412307. It was launched in May 2018. It has 239 units in 5 buildings: 218 homes (1 & 2 BHK) and 21 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Possession was due in April 2025, after an extension of 1 year from the original April 2024. That date has passed and no further extension has been recorded. Construction, averaged across its 5 buildings: excavation 40% complete, structure (RCC) 40% complete, final finishes 20% complete. MahaRERA records do not show it as ready to move in.

92 of its 239 units are booked (38%). Since the December 2025 update, 8 more units have been booked and the reported concrete structure (RCC) has gone from 100% to 40%.

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100016289.Check it on MahaRERA (P52100016289)All projects in Manjari, Shewalewadi